Palm Valley Academy, Nocatee K-8 School

Connelly & Wicker | PRIME AE provided civil engineering support to the Architect preparing Civil Construction Documents for the
construction of a new K-8 school that includes a 190,000 sf school building, a new bus loop parking for staff and visitors.
Connelly & Wicker Inc. prepared construction plans detailing the proposed site geometry, site grading, stormwater
collection, and site utility services to support the proposed improvements. Site design elements included asphalt parking
and bus loop design, concrete sidewalk design (including site ADA accessibility), stormwater collection, potable water
service, and sanitary sewer service.

© 2025, Connelly & Wicker, Inc.