Roadways

I-95 Pecan Park Interchange

Location: Jacksonville, FL
Client: FDOT – D2
Project Description: Reconstruction of a two-lane rural roadway into a four lane urban roadway and the widening of entrance and exit ramps at the        I-95/Pecan Park Road Interchange. The project involved locating storm water management facilities, establishing right of way, developing roadway geometry to accommodate adjacent property owners, relocation of water and sewer lines through a Utility Work by High Contractor agreement, coordination with the Jacksonville Aviation Authority, and lighting coordination with the JEA.
Construction: March 2017 to Present

 

SR 70 ( 15th Street East) Roundabout

Location:  Bradenton, FL
Client: FDOT – D1
Project Description: Connelly & Wicker was the designer for the new roundabout constructed at the intersection of SR 70 (15th Street East) and 9th Avenue East in the City of Bradenton.  Originally contracted by FDOT District 1 to prepare plans for additional left turn lanes on 9th Avenue East, the project was reevaluated using the FDOT’s procedures in the Manual on Intersection Control Evaluation. A modern roundabout was selected as the best cost option for this intersection.    The design required the development of the roundabout geometry, acquiring FDOT Central Office approval, establishing right-of-way requirements, modifying the existing storm sewer system, preparing traffic control plans, lighting design and layout, and assisting the FDOT with utility coordination including a Utility Work by Highway Contractor agreement with the City of Bradenton.  This project was constructed in 2019.
Construction: March 2017 to Present