SR 200 Reconstruction, Yulee, FDOT D2

Connelly & Wicker was a subconsultant to Arcadis to prepare construction plans to increase SR 200 from a 4-lane to 6-lane urban roadway through Yulee, Florida.  This 1.6 mile urban reconstruction project was first of three roadway construction projects to increase capacity along SR 200 from I-95 to the Amelia Island River in Nassau County.  Connelly & Wicker prepared the corridor’s Pond Siting Report and permitted the construction of two (2) stormwater ponds.  Mr. Cummings provided QA/QC service for all phase submittals.